High voltage switchgear insulators creepage distance extending ways in substations
Site Condition Severity Assessment and Insulator/Bushing Upgrade StrategyStep-by-Step Approach:Measure or Estimate Site Condition Severity:Environmental Factors: Assess the severity of environmental conditions such as pollution, humidity, temperature fluctuations, and salt spray (for coastal areas).Operational Data: Collect data on historical insulator performance, including flashover incidents, arcing, and contamination levels.Field Inspections: Conduct visual inspections to identify signs of d