• DC 60-80-120-160-200-240KW EV Chargers
DC 60-80-120-160-200-240KW EV Chargers
$8100.00
Model
PCDC-YZ5-EU240/1k
PCDC-YZ5-EU240/1k
PCDC-YZ5-240/1k
PCDC-YZ5-EU200/1k
PCDC-YZ5-EU200/1k
PCDC-YZ5-200/1k
PCDC-YZ5-EU160/1k
PCDC-YZ5-EU160/1k
PCDC-YZ5-160/1k
PCDC-YZ5-EU120/1kk
PCDC-YZ5-EU120/1k
PCDC-YZ5-120/1k
PCDC-YZ4-EU80/1k
PCDC-YZ4-EU80/1k
PCDC-YZ4-80/1k
PCDC-YZ4-EU60/1k
PCDC-YZ4-EU60/1k
PCDC-YZ4-60/1k
Basic info
Brand Pingalax
Model NO. DC 60-80-120-160-200-240KW EV Chargers
Rated Output Rating 200kW
Output Voltage DC 200-1000V
Max Output Current 250A
Power Conversion Efficiency ≥95%
Connector Options GBT+GBT
Cable Length 5m
Input Voltage 380V
Series DC EV Chargers
Product Detail

60120KW1.png

60120KW2.png

What is OCPP Communication?

OCPP (Open Charge Point Protocol) is an open communication protocol mainly used for communication between electric vehicle charging stations (also known as charging piles or charging points) and central management systems. OCPP aims to achieve interoperability of charging infrastructure, enabling charging equipment produced by different manufacturers to communicate effectively with different central management systems.

Client-server model:

  • Charge Point: As the client, it is responsible for communicating with the central management system.

  • Central System: As the server, it receives information from the charging station and issues instructions.

Know your supplier
Pingalax
Main Categories
New energy
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$100000000
Professional Experience
3 years
Workplace
6000m²
占位
占位
Related Products
Related Knowledges
What to Pay Attention to When Selecting and Installing GIS Current Transformers?
What to Pay Attention to When Selecting and Installing GIS Current Transformers?
Hi everyone, I'm James, and I've been working with current transformers (CTs) for 10 years. Today, I’ll talk about what you need to watch out for when selecting and installing GIS current transformers.Part 1: Key Considerations During Selection1. Accuracy ClassProtection-grade CTs: Used for relay protection — focus on overload capacity and transient response.Metering-grade CTs: Used for billing purposes — require high accuracy, usually 0.2S or 0.5S class.2. Rated Primary Curren
James
07/07/2025
Selection of Primary Verification Circuit and Parameter Measurement for UHV GIS Current Transformers
Selection of Primary Verification Circuit and Parameter Measurement for UHV GIS Current Transformers
In UHV GIS, current transformers are key to electric energy metering. Their accuracy determines power trade settlements, so on - site error verification perJJG1021 - 2007is needed. On - site, use power supplies, voltage regulators, and current boosters. Due to encapsulation in GIS, build test circuits via exposed grounding knives, bushings, and return conductors; right circuits simplify wiring and boost accuracy.Challenges like large test current, long circuits, and high impedance exist, but rea
Oliver Watts
07/07/2025
What are the polarity test methods for GIS current transformers?
What are the polarity test methods for GIS current transformers?
I’m Oliver, an 8 - year current transformer testing pro. Today, let’s break down new and old polarity test methods for GIS current transformers—how they work and their pros/cons.1.Testing Methods1.1New MethodPre - test ops: Open FDS21/FDS22 fast disconnectors + DS23 disconnector. Close CB21 breaker, then ES21/ES22 grounding disconnectors. Disconnect ES21’s SF6 - shell ground.Wiring: Connect battery between ES21’s moving contact (negative grounded) + ground electrode
Oliver Watts
07/07/2025
Exploring the Design and Application of Photoelectric Current Transformers in GIS
Exploring the Design and Application of Photoelectric Current Transformers in GIS
1.Design and Application Example of Photoelectric Current Transformer in GISThis article takes a 126kV GIS project as a specific example to deeply explore the design ideas and practical application of photoelectric current transformers in the GIS system. Since this GIS project was officially put into operation, the power system has remained stable, with no major failures occurring, and the operation status is relatively ideal.1.1 Design and Application Ideas of Photoelectric Current TransformerI
Dyson
07/07/2025
Maintenance and Diagnostic Analysis of Current Transformers in GIS Equipment
Maintenance and Diagnostic Analysis of Current Transformers in GIS Equipment
I'm Oliver, with 8 years of experience in current transformer testing. These are all practical experiences, shared with you1 Maintenance of Current TransformersHaving been in the business of current transformer testing for 8 years, I know a thing or two about their maintenance! The maintenance of current transformers is divided into minor repairs, intermediate repairs, and major overhauls.Minor repairs mainly involve opening the cover (if necessary) and changing the oil, usually carried out once
Oliver Watts
07/07/2025
What are the possible causes of cracking failure in CT terminal blocks within GIS equipment?
What are the possible causes of cracking failure in CT terminal blocks within GIS equipment?
Gas - insulated switchgear (GIS) , often called “SF6 combined electrical apparatus”, is widely used in power systems for its high reliability, small footprint, low noise, and low loss. It encloses high - voltage devices like circuit breakers, fast grounding switches, current transformers, and busbars in a grounded metal shell filled withSF6gas. Each device sits in a separate gas chamber with different pressures. The CT terminal block divides gas chambers, connects components, and eas
Felix Spark
07/07/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!