• Prepayment Smart Energy Meters Can Operate the Recharging
  • Prepayment Smart Energy Meters Can Operate the Recharging
  • Prepayment Smart Energy Meters Can Operate the Recharging
Prepayment Smart Energy Meters Can Operate the Recharging
$90.00
Model
SPM-240/5(30)-2CHARGE
SPM-240/5(32)-2CHARGE
SPM-240/5(40)-2CHARGE
SPM-240/5(45)-2CHARGE
SPM-240/5(50)-2CHARGE
SPM-240/5(100)-2CHARGE
SPM-240/5(30)-1CHARGE
SPM-240/5(32)-1CHARGE
SPM-240/5(40)-1CHARGE
SPM-240/5(45)-1CHARGE
SPM-240/5(50)-1CHARGE
SPM-240/5(100)-1CHARGE
SPM-240/5(80)-2
SPM-240/5(80)
Basic info
Brand Wone
Model NO. Prepayment Smart Energy Meters Can Operate the Recharging
Rated voltage 240V
Rated normal current 5(32)A
Rated frequency 50(Hz)
Methods of Communication LoRa
Series K019-04
Product Detail

Description

The meter has 3 operation modes: STS token mode, currency prepayment mode and postpayment mode, which can be switched through communication. Self-diagnosis: EEPROM check, low battery alarm, relay status detection. LCD display is adopted, and the housing of the energy meter is made of flame-retardant PC material.

Features

  • Support load ground connection, switch detection, influence of external magnetic field, abnormal voltage record.

  •  Anti-tamper when Neutral missing:when Neutral missing, the meter still can workbattery support

  • Divide into weekday timetable and weekend timetable, with 8 time period and 8 tariffs. Every timetable has a backup table for remote updating of backup timetable and configure the switching time. Meter will automatically switch the tariff table at the switching time.

  • Meter support IR,RS485/LoRa, baud-rate: 9600/PLC, baud-rate: 4800.

  • Open cover, magnetic field, load ground connection, reserve current, over-voltage, low-voltage, low-frequency, overload, power-fail, low remaining power, and token record.

  • Meter measures voltage, current, active power, reactive power, frequency, power factor, MD in the current month, MD of last 1 month, MD of last 2 month, the absolute value of total active energy, the absolute value of total active tariff energy, total input energy of the current month, total input energy of last 5 month, total output energy of the current month, total output energy of last 5 month, and total reactive energy.

  •  Meter has 3 operation modes: STS token mode, currency prepaid mode and post-paid (traditional) mode, which can be switched.

  • And the currency mode can be divided into tariff mode and step price mode. Modes can be configured through communication.

  • Enter 20-digit token via keypad of meter or IHD, the meter display will be green Pic 1 if recharging is successful, will be red Pic 2 if is failed.

Specifications

Main
Range K019-04
Product or Componet Type Energy meter
Country of origin China
Complementary
Phase Single Phase
Type of measurement

----

Metering type

Measurement

Device Application

Energy Charge

Accuracy class Active power 1.0 
Rated Current 5(80)A

Rated Voltage

240V

Network Frequency 50-60Hz
Technology Type Electronic
Display Type LCD display(LCD 6+2 = 999999.99kWh)
Impulse Constant

1000imp/kWh(LED)   1000imp/kvarh

Maximum value measured 99999.99kWh
Tariff input ---
Communication port protocol DLMS/COSEM(IEC62056)
Communication port support RS485/LoRa
Local signalling

------

Number of inputs -------
Number of Outputs --------------
Output voltage 230V
Mounting Mode --
Mounting Support -----
Connections - terminals

-----

Standards

  IEC62052-11 2003, IEC62053-21 2003



Environment
IP degree of protection

IP54

Relative humidity <95%
Ambient air temperature for operation -20…70 °C
Ambient Air Temperature for Storage --30…80 °C
Operating altitude ---
Dimensions 207*120*55.5mm
Packing Units
Unit Type of Package 1 PCE
Number of Units in Package 1 1
Package 1 Height 57mm
Package 1 Width 122mm
Package 1 Length 209mm
Package 1 Weight 1.000kg



Connection Diagram

image.png



Dimensions


image.png









Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放