• AC load bank 3KW-5MW
AC load bank 3KW-5MW
discuss personally
Model
DRLB-200
DRLB-150
DRLB-120
DRLB-100
DRLB-20
DRLB-10
DRLB-5
DRLB-3
Basic info
Brand Wone
Model NO. AC load bank 3KW-5MW
Power 20KW
Series DRLB
Product Detail

Description

  • It is used for the detection and maintenance of AC power supply equipment, performance testing of various switches and contactors, loading,
    burn-in, simulated load test, etc.

  • Power Range: 1kW-5MW (others on request).

  • Current Range: 0.1A-15000A.

  • Working Voltage Range: single phase, 3 phases, or custom requests.

  • Multiple safety protection functions : short circuit, over-current, over voltage, over-load, over temperature, fan fault, audible and visual alarm
     device, etc.

  • It can be designed with RS232 and RS485 to connect with PC for remotecontrol.

  • Forced air cooling and water cooled are available.

  • Production Time :3-4 weeks
    Widely used in test equipment, such as generator load, charging pile test,inverter power supply, data center test, server room load test, UPS, etc.


Parameter

Dimensions (mm)
Power L±5 W±5 H±5 h±5
3KW 580 380
250
70
5KW 680 380 250 70
6KW 680 450 250 70
8KW 450
500 700
70
10KW 500 500 800 100
15KW 500 550 800 100
20KW 600
600 800 100
25KW 600 650 800 100
30KW 600 650 1000
100
40KW 680
680
1100 100
50KW 680 680 1200 100
60KW 850
850
1200 100
80KW 850 850 1300
150
100KW 850
850 1400 150
120KW 900 850 1400 150
150KW 900 850 1500
150
200KW 1000
850 1500 150
300KW 1400 1200 1650 150
400KW 1500 1200 1800
150
500KW 1500
1400 1800 150
600KW 1500 1500 1800 150
800KW 1800 1500 1900
150
1000KW 2000
1500 1900 150
1200KW 2000 1600
1900 150
1500KW 2200 1600 1900 150
2000KW 2400 1800
2000
150



Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放