• 640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
  • 640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
discuss personally
Model
WN7N-640MB-AG
Basic info
Brand Wone
Model NO. 640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
Power Bifaciality 70%
Max. System Voltage 1500V (IEC)
Max. Series Fuse Rating 35 A
Module Fire Performance CLASS C
Max. power of the module 670 W
Max. efficiency of Module 21.6 %
Series Bifacial MONO PERC
Product Detail

Features

  • Module power up to 670 W Module efficiency up to 21.6 %.

  • Up to 8.9 % lower LCOE Up to 4.6 % lower system cost.

  • Comprehensive LID / LeTID mitigation technology, up to 50% lower degradation.

  • Compatible with mainstream trackers, cost effective product for utility power plant.

  • Better shading tolerance.

Standard

  • 40 °C lower hot spot temperature, greatly reduce module failure rate.

  • Minimizes micro-crack impacts.

  • Heavy snow load up to 5400 Pa, wind load up to 2400 Pa*.

Engineering drawing(mm)

image.png

CS7N-650MB-AG / I-V gurves

image.png

Electrical date/STC*

企业微信截图_17301819004341.png


Electrical date/NMOT*

image.png

Electrical date

image.png

Mechanical charactheristics

image.png

Temperature characteristics

image.png

What is LCOE?

LCOE (Levelized Cost of Energy) refers to the levelized cost of electricity. It is a method used to evaluate the average cost of a power plant throughout its entire life cycle. LCOE takes into account all the expenses of the power plant's construction and operation and apportions them to each unit of electricity produced, thereby measuring the economic viability of a power generation project.

Calculation Formula:

The basic calculation formula for LCOE is as follows:

LCOE = Present Value of Total Costs / Present Value of Total Electricity Generation

Among them, the "Present Value of Total Costs" includes the sum of all costs after discounting, such as construction costs, operation and maintenance costs, fuel costs, decommissioning costs, etc.; the "Present Value of Total Electricity Generation" is the value after discounting of the total electricity generated by the power plant throughout its entire life cycle.


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放