• 550kV HV SF6 Circuit Breaker
550kV HV SF6 Circuit Breaker
discuss personally
Model
LW55B-550/4000-63
Basic info
Brand Wone
Model NO. 550kV SF6 Circuit Breaker
Rated voltage 550kV
Rated normal current 6300A
Series LW55B
Product Detail

Description:

LW55B-550/Y4000-50 tank type SF6 circuit breaker is the 3-phase AC transmission equipment.Used in the power system of 550KV, can be realized the controlling, measurement and protection. It is composed of circuit breaker, current transformer and bushings for the wire’s incoming and outgoing. Circuit breaker is a single fracture design, equipped with the first domestic integrated block, high-power hydraulic operating mechanism, all of the hydraulic pipes built-in, no leakage.

This is a product based on new technology research and development, and its performance is at the leading level in the world.


Main Features:


  • Circuit breaker arcing chamber is a single fracture design, simple and reasonable structure, high technical content.

  • Strong breaking capacity, long contact electrical life(rated short circuit breaking up to 20 times), long service period.

  • As for the rectifier circuit breaker, except for the bushing unit is packaged independently, arcing unit, hydraulic operating mechanism, current transformer and other components are packaged as a whole unit, without on-site docking and adjustment, easy installation.

  • Circuit breaker unit is installed on site without opening the chamber, which can be filled the SF6 gas directly, to avoid the intrusion of dust and foreign bodies

  • There are almost no external pipe for this new type of hydraulic operating mechanism, the possibility of oil leakage is reduced.

  • When operating the oil pressure, hydraulic operating mechanism is controlled by the pressure switch automatically, can be maintained constantly the rated oil pressure without being affected by ambient temperature, at the same time, the relief valve in the mechanism can be exempted from the risk of overpressure.

  • After the loss of pressure, hydraulic operating mechanism has the function of not slowing points when the pressure is reconstructed.

  • The closing resistance of the product can be installed or removed according to the user’s requirements.

Technical Parameters:

1720766371937.png

What are the requirements for monitoring the gas decomposition products of the SF6 tank circuit breaker?


During the normal operation and interruption processes of a circuit breaker, SF₆ gas can decompose, producing various decomposition products such as SF₄, S₂F₂, SOF₂, HF, and SO₂. These decomposition products are often corrosive, toxic, or irritating, and therefore require monitoring.If the concentration of these decomposition products exceeds certain limits, it may indicate abnormal discharges or other faults within the arc quenching chamber. Timely maintenance and handling are necessary to prevent further damage to the equipment and to safeguard personnel health.


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放