Description

WDYZ-205 Zinc Oxide Arrester Live Tester completely solves the problem of on-site live test of 6-35kV Zinc Oxide Arrester. Realize the on-line uninterrupted test of zinc oxide arrester!

 No need to climb poles, no wiring, fast and accurate test!

The tester is suitable for voltage levels of 6kV-500kV and has a variety of sampling methods. It is a special instrument for testing the electrical performance of zinc oxide arresters.

 Dangerous defects such as damping of the internal insulation of the equipment and aging of the valve plate.

Specifications

  •  Working power supply:

    Host - internal battery power supply, charging time > 3 hours, continuous work > 8 hours.

    Wireless Current Clamp - Powered by internal battery, charging time > 1 hour, continuous working > 8 hours.

  •  Measuring range:

    Host leakage current: 0.000-20mA (expandable).

    Host voltage: 30-250V (expandable).

    Wireless current clamp current: 0-20mA (expandable).

    Wireless current clamp voltage: 0-60kV (bare wire 0-35kV).

    Wireless current clamp jaw: Ø33mm.

    Wireless current clamp transmission distance > 30 meters.

  •  Measurement accuracy:

    Current: When the full current is >100μA: ±5% reading ±1 word.

    Voltage: When the reference voltage signal is >30V: ±5% reading ±1 word.

  •  Measurement parameters:

      Leakage current: full current waveform, fundamental RMS value, peak value.

      Leakage Current Resistive Component: Waveform.

      1, 3, 5, 7, 9 valid values.

      Positive peak Ir+ Negative peak Ir-.

     Capacitive current fundamental.

     Voltage: voltage waveform, voltage RMS.

      Phase angle difference, power consumption.

  •  Lithium battery parameters:

    Charging time > 2.5 hours.

    Continuous working time > 7 hours.

    Intermittent working time > 7×24 hours.

  •      Main box size and weight:

     Main box: 42cm×34cm×18cm.

      Host: 7.0kg.

  • Insulation rod size and weight:

    Wireless current clamp 70mm×30mm×250mm 0.5KG.

    Insulation rod Ø30mm×1000mm 5 pieces 5.0KG.

    Wire pack box 1000×100mm×240mm 6.2KG.







Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
Analysis of Grounding Transformer Operational Behavior Under System Single-Phase-to-Ground Fault Conditions
Analysis of Grounding Transformer Operational Behavior Under System Single-Phase-to-Ground Fault Conditions
1 Theoretical AnalysisIn distribution networks, grounding transformers serve two key roles: powering low - voltage loads and connecting arc - suppression coils at neutrals for grounding protection. Grounding faults, the most common distribution network fault, heavily impact transformers’ operating characteristics, causing sharp changes in electromagnetic parameters and status.To study transformers’ dynamic behaviors under single - phase grounding faults, build this model: Assume a tr
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放