• Three-phase Keypad Smart Energy Meter
  • Three-phase Keypad Smart Energy Meter
Three-phase Keypad Smart Energy Meter
$70.00
Model
TPEM-100
Basic info
Brand Wone
Model NO. Three-phase Keypad Smart Energy Meter
Rated normal current 100A
Analogue input type Direct input
Communication port support RS485/RF
Number of outputs 1 pulse
Number of inputs 1
Multi-tarff 4 tariffs
Current transformer No
Series GST7666-G
Product Detail

Description

GST7666-G  is  a three-phase multi-function energy meter with embedded communication modules, used to accurately measure energy for commercial, industrial & residential customers. The meter supports optional communication modules of PLC/RF/GPRS/3G/4G, with communication protocol complying with DLMS/COSEM protocol. It could be optionally used in STS-compliant prepayment mode or postpaymentmode .

Feature

  • STS-compliant prepayment.

  • DLMS/COSEM compliant.

  • Built-in load control.

  • Infrared port/RS 485.

  • Tamper detection & recording.

  • Active/reactive energy measurement.

  • LCD display capable of reading without power.

  • Prepayment/postpayment mode switchable.

  • Plug & play PLC/RF/GPRS/3G/4G module.

  • Display scroll button or STS keypad (optional).

  • Programmable warning of power limit & low credit.

  • Dual power source switchable between power grid & solar system.

  • Disconnecting on overload & no-credit condition.

  • Max demand measurement & load profiling(customizable).

Specifications

Main
Range GST
Model NO. GST7666
Product or Componet Type Energy meters
Country of origin China
Complementary
Phase Three-phase
Type of measurement

Active power;current

voltage;Active power

Metering type

Active,

reactive, 

apparent energy (signed, four quadrant)

Device Application Keypad ,Multi-tariff
Accuracy class

Class1.0  active energy IEC62053-21

Class2.0  Reactive energy as IEC62053-23

Input type ---
Rated voltage 230V
Network Frequency 50~60Hz
Technology Type Electronic
Display Type LCD display
Sampling rate ---
Maximum value measured -----
Tariff input Tariff 4
Communication port protocol ---
Communication port support RS485/RF
Local signalling Green indicator light power ON
Yellow flashing LED accuracy checking
alarm overload
Number of inputs ---
Number of Outputs ---
Output voltage ---
Mounting Mode ---
Mounting Support ---
Connections - terminals Maximum cable size 10mm
Standards

IEC62053-21

IEC62053-23

Environment
IP degree of protection P54
Ambient air temperature for operation -25℃~+70℃- IEC
Ambient Air Temperature for Storage -40℃~+85℃
Dimensions 120*68*29/244*165*79
Packing Units
Unit Type of Package 1 PCE
Package 1 Height
Package 1 Width
Package 1 Length
Package 1 Weight



Dimensions



image.png

image.png

image.png

image.png

image.png




Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放