• Single Phase Smart Prepayment Meter
  • Single Phase Smart Prepayment Meter
Single Phase Smart Prepayment Meter
$60.00
Model
SPM-230/5(30)
SPM-230/5(32)
SPM-230/5(40)
SPM-230/5(45)
SPM-230/5(50)
SPM-230/5(80)
SPM-230/5(100)
Basic info
Brand Wone
Model NO. Single Phase Smart Prepayment Meter
Rated voltage 230V
Rated normal current 5(30)A
Rated frequency 50(Hz)
Methods of Communication HPLC
Series D114071-HPLC
Product Detail

Description

It is a single-phase two wire three modular DIN RAIL prepayment smart meter, with built-in motor relay and HPLC module, automatic networking, can realize remote reading, remote recharge, remote balance clearing,  when there is overload or no credit will cut off the power automatically. At the same time, it has Bluetooth communication, which can connect with in-home-display and mobile phone for data reading and setting.

Feaures

  •  Recharging Token for the latest 10 times ( 20-bit code generated when recharging Token).

  • The latest 10 events of over/under voltage, low frequency, overload, temperature, low credit  
    Support HPLC communication, automatic networking when power on, without manual setting.

  •  The meter can store up to 31 days of 24-hour power and monthly and annual hourly cumulative data.

  • When the load exceeds the set power threshold for more than 3 seconds, the relay will be disconnected, and the overload threshold can be set by software.

  •  Meter support terminal cover detection. When the terminal cover is opened, the indicator symbol of electricity tampering flashes.

  • Meter has the function of detecting the imbalance of two circuits. The indicator symbol of electricity tampering flashes when the current is unbalanced between live wire and neutral wire.

  • The meter supports Bluetooth, RS485 local upgrade and 4G remote upgrade, which can update the firmware in time.

Specifications

Main
Range D11
Model NO. D114071-HPLCD114071-HPLCD114071-HPLCvHPLCD114071-HPLC D114071-HPLCD114071-HPLC 
Product or Componet Type Energy meters
Country of origin China
Complementary
Phase Single Phase
Device Application Prepayment Meter
Accuracy class

Class1.0  active energy IEC62053-21

Rated voltage 230V
Network Frequency 50Hz
Current 5(100)A
Pulse constant
1000imp/kWh
Starting current 0.4%Ib
Power consumption
≤10VA  ≤2W
Technology Type Electronic
Display Type LCD 6+2
Communication port protocol IDIS
Communication port support HPLC/Bluetooth/RS485(baud rate 115200)
Standards

DLMS\HPLC

Environment
Ambient air temperature for operation -20~75℃
Ambient Air Temperature for Storage -20-80℃
Relative humidity 75%


ConnectlonDiagram

image.png

image.png












Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放