• 4-15kW Three Phase 2 MPPTs Residential Grid-tied Inverters
  • 4-15kW Three Phase 2 MPPTs Residential Grid-tied Inverters
4-15kW Three Phase 2 MPPTs Residential Grid-tied Inverters
discuss personally
Model
WN4K-DT
Basic info
Brand Wone
Model NO. 4-15kW Three Phase 2 MPPTs Residential Grid-tied Inverters
weight 16Kg
Max.Input Voltage 1000V
Max. Input Current per MPPT 12.5A
Number of MPP trackers 2
Nominal Output Voltage 620V
Series Residential Grid-tied Inverters
Product Detail

Description:

The SDT Series is one of the best options available on the residential & commercial segments thanks to its technical strengths that make it one of the most efficient in the market. For enhanced safety, this inverter is able to incorporate AFCI. Its high efficiency (98.3%) and its enhanced oversizing & overloading capabilities represent an outstanding improvement in the industry. Moreover, its plug-in AC connector make operation & maintenance easier.

Feature:

  • Up to 98.3% max. efficiency.

  • 150% DC input oversizing & 110% AC output overloading.

  • Arc-fault circuit interrupter optional.

  • Easy installation and O&M.

System Parameters:

image.png

image.png

What is AFCI?

Definition: AFCI (Arc-Fault Circuit Interrupter) is a special circuit breaker or outlet that is used to detect arc discharges in electrical wires and cut off the power supply when an arc is detected to prevent fires and other electrical faults.

Working Principle:

  • Arc Discharge: Arc discharge refers to the electric spark or arc generated when current passes through an air gap. This usually occurs when the wire insulation is damaged, the connection is loose, or the wire is aged.

  • Detection Mechanism: AFCI devices identify the current signal characteristic of arc discharge by monitoring the current waveform in the circuit.

  • Power Cut - off: Once arc discharge is detected, AFCI will quickly cut off the power supply to prevent the arc from causing a fire or other electrical accidents.

Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放