• 125A Residual Current ProtectedMolded Case Circuit Breaker
125A Residual Current ProtectedMolded Case Circuit Breaker
$150.00
Model
ARM1L-400/125
Basic info
Brand Wone
Model NO. Residual Current ProtectedMolded Case Circuit Breaker
Rated voltage 400V
Rated normal current 125A
Series Arm1L
Product Detail

Description

Residual current circuit breaker, mainly applicable to AC 50Hz, rated voltage 400V, rated current up to 800A in the distribution network, used to provide indirect contact protection to people, can also be used to prevent fire hazards caused by equipment insulation damage, resulting in ground fault current, and can be used to distribute electrical energy and protect the line and power supply equipment overload and short circuit, but also as the line of infrequent conversion and motor Infrequent switching and motor starting. Conventional leakage protection module with residual current protection circuit breaker work power sampling for two-phase, this series of circuit breakers for three-phase, if the lack of a phase, circuit breaker leakage protection module can still work normally; rated residual action current and maximum disconnection time according to the actual situation on site adjustable; when the phase voltage is reduced to 50V, leakage protection module can still work normally

Basic Info.

image.png

External dimensions

image.png


Environmental requirement


1,The surrounding air temperature state is: -5ºC~+40ºC

2,The altitude of the installation site does not exceed 2000m

3,The relative humidity of the air at the installation site does not exceed 50% at the highest temperature of +40ºC, and can have a higher relative humidity at lower temperatures, such as up to 90% at 20ºC. Special measures should be taken for the occasional condensation due to temperature changes.

4,The pollution level is 3

5, wet and hot band type (TH type) circuit breakers through GB/T2423.4, GB/T2423.18 test requirements, can withstand the effects of humid air, salt spray, oil mist, mold.

6,The circuit breaker should be installed in a place where there is no danger of explosion and no conductive dust, not enough to corrode the metal and destroy the insulation

7, the circuit breaker should be installed in a place where there is no rain or snow intrusion

8,Operating conditions: the circuit breaker passes the test requirements of GB/T 2423.1 and GB/T2423.2, the surrounding air temperature can be as low as -25ºC (ARM1DC/ARM3DC/ARM6DC can provide temperature as low as -40ºC, consult our company), as high as +70ºC (more than 40ºC reduced capacity use, see the technical information in the attached sample)

Product show


image.png


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放