To ensure the superior quality and performance of each AC circuit breaker in terms of materials, design, and assembly, manufacturers perform routine tests on every unit produced. These tests are essential for verifying the reliability and safety of the circuit breakers, confirming their ability to function correctly under specified conditions.
For multi-phase circuit breakers consisting of multiple breaker units (such as V-type or T-type configurations), routine testing is conducted on the fully assembled transport units. The transport units, which include column insulators and breaker units, are mounted on a specially designed frame to connect to the operating mechanism. This custom frame not only simplifies the electrical connections during testing but also replicates the actual working conditions of the circuit breaker when installed on-site, ensuring the accuracy and reliability of the test results.
The following items are the routine testing items of AC High voltage circuit breaker according to IEC 62271-1,IEC 62271-100 Standards:
The dry, short-time power frequency voltage test shall be conducted, with the test voltage following the values specified in the second column of the table and adhering to the relevant IEC standards. When determining the test voltage, the effect of altitude on the voltage values must be taken into account. This test is performed only when the circuit breaker is in the open position and applies to both single-unit and multi-unit circuit breakers.
By conducting this test, the insulation performance and dielectric strength of the circuit breaker can be verified under actual operating conditions, ensuring its reliability and safety in high-voltage environments.
For circuit breakers assembled with identical interrupting and closing units connected in series, the test voltage applied to each individual unit during the open state should correspond to the higher portion of the total withstand voltage generated by the actual power frequency voltage distribution when the circuit breaker is fully open and one terminal is grounded.
The above tests for single and multi-unit circuit breakers should be conducted according to the following connection diagram:
Single Unit Circuit Breaker Testing:
Multi-Unit Circuit Breaker Testing:
Material and Assembly Inspection: Thoroughly inspect the materials, assembly quality, surface treatment, and, if necessary, corrosion protection coatings of the auxiliary and control circuits to ensure they comply with relevant standards and specifications. Conduct a visual inspection to confirm that insulation layers are properly installed and that the wiring of conductors and cables is accurate, ensuring high-quality installation.
Diagram Compliance Verification: Verify that the physical installation of the auxiliary and control circuits exactly matches the circuit diagrams and wiring diagrams, ensuring all connections and components are accurately installed according to the design documents. This step is crucial for ensuring system reliability.
Low-Voltage Circuit Function Verification: Perform comprehensive functional tests on all low-voltage circuits to ensure that the auxiliary and control circuits operate correctly in conjunction with other components of the circuit breaker. Adjust the test procedures based on the nature and complexity of the low-voltage circuits, including:
Direct Contact Protection Check: Conduct a visual inspection to ensure adequate protection against direct contact with the main circuit, preventing accidental electric shock. Additionally, check the accessibility of auxiliary and control equipment components that may be touched during normal operation to ensure they are safe and accessible, protecting operators from harm. This ensures electrical safety during routine operations.
Power Frequency Dielectric Testing: Only perform power frequency dielectric testing. The test voltage should be 1 kV or 2 kV, with a duration of 1 second and a frequency of 50 Hz or 60 Hz. This test should be conducted on terminals, motors, auxiliary switches, and control circuits to verify their insulation performance and withstand voltage capability. This ensures the electrical safety and reliability of the system.
For routine testing, measure the DC voltage drop or resistance of each pole of the main circuit under conditions as similar as possible to those used in type testing (including ambient air temperature and measurement points). The measured resistance must not exceed 1.2 times Ru, where Ru is the resistance measured before the temperature rise test. This ensures that the main circuit's resistance remains within acceptable limits, guaranteeing the long-term stable operation of the circuit breaker and enhancing system reliability.
Routine Sealing Test: Sealing tests should be conducted at normal ambient air temperatures, with the component's charging pressure (or density) following the manufacturer's specified testing methods. For gas-insulated systems, sniffing techniques can be used for leak detection, ensuring that the gas seal is intact and preventing leaks that could affect the device's normal operation. This ensures the integrity and safety of the sealing system.
A:Controlled pressure systems for gas:
Find the relative leakage rate F re by measuring the pressure drop over a time period.
B:Closed pressure systems for gas:
The test may be performed at different stages of the manufacturing process or of assembling on site, on parts, components and subassemblies.For gas-filled systems leakage detection by using a sniffing device may be used.
Sealing tests should be conducted on gas-insulated switchgear and control equipment to determine the expected service life of the sealing pressure system. These tests ensure the integrity of the gas sealing system, preventing gas leaks and ensuring long-term reliable operation.
Each vacuum interrupter should be uniquely identified by its serial number. The vacuum pressure level of each vacuum interrupter should be tested by the manufacturer of the vacuum arc chamber, and the test results should be documented. After assembly, an important routine dielectric test should be performed to verify the vacuum pressure level of the vacuum interrupters. This test is conducted across the open contacts, and the test voltage should be specified by the manufacturer. The dielectric test should be carried out after the mechanical routine tests required by relevant product standards to ensure the insulation performance and withstand voltage capability of the vacuum interrupters.
Switchgear and control equipment should be inspected to verify compliance with the purchase specifications. The following items must be checked:
A complete mechanical operation test should be performed on the circuit breaker. For all required operating sequences, the following procedures should be executed, and the operating times for closing and opening operations should be recorded:
The following diagram shows a typical mechanical contact curve, illustrating the characteristic features of contact movement:
The mechanical operation testing should ensure that the number of recorded points is sufficient to accurately determine the contact time, contact speed, contact closing and separation times, as well as the total travel time. The test should include the following components:
Additional checks should include:
After completing the required operating sequences, the following tests and inspections should be performed (where applicable):