Life Cycle Cost Analysis of Power Transformers Based on IEC Standards
Life Cycle Cost Analysis of Power Transformers Based on IEC StandardsCore Framework Under IEC StandardsAccording to IEC 60300-3-3, the life cycle cost (LCC) of power transformers includes five stages:Initial Investment Costs: Procurement, installation, and commissioning (e.g., 20% of total LCC for a 220kV transformer).Operational Costs: Energy losses (60%-80% of LCC), maintenance, and inspections (e.g., annual savings of 2,600 kWh for a 1250kVA dry-type transformer).Decommissioning Costs: Residu